Translation Agencies Database Translation Jobs
spacer
Faisal Awan

1 year TC Master
since Mar. 18, 2007

Faisal Awan

Verified Member Click to get help
"Chinese Technical (Aerospace) Translator & Telephonic interpreter"
Linking Chinese

Pakistan

Mother Tongues:
Urdu, English
Available
Available

Disabled Log on to post feedback Click to get help
.
ServicesSpecializationBackgroundSoft & HardwareMembership

Contact Information

TopTOP

Joined: Oct. 25, 2003, last update Dec. 22, 2008
e-mail Preferred E-mail of Faisal Awan: send a message
second e-mail Second E-mail of Faisal Awan: send a message

Website: http://www.LinkingChinese.org

Working Language Pairs

TopTOP

Chinese > English, English > Chinese


Language locales: English - United States, Chinese (Simplified), Chinese - China

Services

TopTOP

Interpreting, Interpreting - Phone, Translation

Specialization

TopTOP

Chinese-English technical (aerospace) translation.
Chinese-English telephonic interpretation

Subject Areas

TopTOP

Aerospace Engineering, Aircraft, Aviation, Electrical Engineering, Engineering

Background

TopTOP

Experience

Sep 16, 2002 to date       Ministry of Defense                                        Islamabad, Pakistan

Chinese Translator & Interpreter

 

CHINESE-ENGLISH TECHNICAL TRANSLATION

Aerospace

Aerial Vehicles

  • Analysis and assessment of launch accuracy of aerial vehicle
  • Exterior design & structural layout of aerial vehicle
  • Flight path design of aerial vehicle
  • Load computation and analysis of aerial vehicle during flight
  • Motion equations of aerial vehicle
  • Overall design of aerial vehicle
  • Overall design of control system
  • Overall test & launch control
  •  Reliability of aerial vehicle

 Accelerometers

  • Circuits of pendulous accelerometers
  • Design and application of two element width-adjusted circuit for quartz accelerometer with large measurement range
  • Effect of major sources of centrifuge to acquire the nonlinear coefficient of a quartz pendulum accelerometer by computer simulation
  • Full scale centrifugal screening of quartz flexible accelerometer during assembly
  • Manual for quartz accelerometer
  • Pendulous accelerometer
  • Research on compensating error model of quartz flexible accelerometer
  • Hybrid Integrated circuits

Connectors 

  • Circular electric connector
  • Sealed connector
  • Umbilical connector

 

Propulsion

  • Design for inner insulation of combustion chamber
  • Sealing, adhesives material, nozzle assembly

 

Navigation

  • Initial alignment method for low-cost strap-down inertial navigation system
  • Distributed discrete Kalman Filtering method—An effective data fusion method
  • Kalman Filter design of inertial positioning system

 

 

China (GB) National Standards

  • GB-4J36  Low expansion alloy
  • GB 11067.1-89  Methods of chemical analysis of silver
  • GBT 15001-94 General rules for the dimensions, profile, surface quality, test method and inspection of soft magnetic alloy
  • GB/T 15002-94  Technical requirements for high saturation magnetic induction soft magnetic alloys
  • GB 1695-81 Dielectric strength and voltage-proof determination method for vulcanized rubber industrial frequency disruption
  • GB-1696-81 Determination method for hard rubber transverse breakdown strength
  • GB -1697-82  Ebonite—Method of test for impact strength
  • GBn- 223-84  Aluminum alloy forging
  • GB 3190-1996  Wrought aluminum and aluminum alloys

 

Miscellaneous

·        Air conditioning plant

  • Analytical balance
  • Construction of clean room
  • D/C Impulse width servo system
  • Multi-meter
  • Remote control helicopter
  • Optical dividing head
  • Oscilloscope
  • Processing techniques
  • Single input channel digital smart meter
  • Techniques
  • Tests
  • Welding machine

 CHINESE TECHNICAL INTERPRETATION

·        Chinese-Urdu/English consecutive & simultaneous interpretation for trainings & meetings

 

 

Feb 22, 2008-March 27, 2008  Capital Consultants                                       Park View Plaza, F-10 Markaz, Islamabad, Pakistan

Chinese Technical Interpreter

·         Installation & training for Underground Facility Management

 

Jan 01, 2007-Feb 14, 2007      K. M.Enterprises                                      No 302, #rd Floor, Royal Center, Fazal-ul-Haq Road, Blue Area, Islamabad, Pakistan   www.kme.com.pk  

Chinese Technical Interpreter

·         Installation & Training for Horizontal Planner Machine with Grinding Attachment

 

May 07, 2007- May  10, 2007 K. M. Enterprises                                         No 302, #rd Floor, Royal Center, Fazal-ul-Haq Road, Blue Area, Islamabad, Pakistan   www.kme.com.pk

Chinese Technical Interpreter  

·         Installation & Training of Coordinate Measuring Machine (CMM)—May 07, 2007-May 10, 2007

 



Software

TopTOP

Chinese dictionaries
Transtar

Hardware

TopTOP

P4 PC+ Scanner + Printer + Internet Multimedia devices + CD

Membership

TopTOP

Nil



Payment Options

TopTOP

Faisal Awan accepts payments through the following payment processors:



Home | Close window